Just a small addition to this:
These people who take care of the 'main' release of the branch
will also be responsible for possible minor releases for the same
branch. (4.2.0 is the main release, 4.2.1 a minor one..)
So nobody but the RM shall _NOT_ touch the branch.
_Only_ RM does MFH or RBM will B.
Developers should be aware of this and notify the RM/RBM whenever
they fix some bug and think it should be included in a minor release.
--Jani
On Fri, 1 Mar 2002, Derick Rethans wrote:
>Hello folks,
>
>I promised to send a more detailed mail for the upcoming release process.
>Please note that this is my view on it :)
>
>Timeline
>--------
>06-02-2002 Branch to PHP_4_2_0
>
> Only the release master is allowed to merge fixes from HEAD
> into the release branch. This is to make sure no stray changes
> in code end up into the branch, which are not correctly tested
> during the RC process.
>
> After the branch point the QA should make a list of what should
> be tested with more care than normally would have been done.
> I'll call them 'special' area's from now. Things like the
> fileuploading stuff should be mentioned here. Also some more
> tests should be developed/written here. The set of things that
> follow from this pinpointing operation are the final
> requirements for this release. When they are solid here, they
> should not change during the RC process to make sure there is
> some point we can actually release, and not end up with RC81 or
> something. Furthermore I think that one person (or two), the
> Test Master(s) should be responsible to write down and maintain
> the the final list.
>
>
>20-02-2002 Release Candidate 1
>
> Ok, time to test the balls out of the RC. During the RC1 period
> the Critical bugs should be tested, fixed and exterminated. All
> bugs that are found during this RC1 and that belong to the
> critical category should be fixed before RC2. All bugs that are
> found in the HEAD branch and get fixed should be merged into
> the release branch by the RM. This RC should be tested by QA
> and PHP-DEV.
>
>
>03-03-2002 Release Candidate 2
>
> After RC2 is release only severe and/or critical bugs that are
> found in the HEAD branch should be merged by the Release
> Master. The main task of RC2 is to test all bugs that are fixed
> during RC1 and of course more of the 'special areas'. Testing
> and the collection and ordening of results should be done by
> PHP-QA.
>
>
>12-03-2002 Release Candidate 3 / Final RC
>
> In the most ideal situation all bugs that
> should-be-fixed-before-release are found and fixed now. This
> final RC should be tested by QA and match the requirements set
> during the period between branch and RC1.
>
>
>19-03-2002 Prepare release package
>
> If no critical bugs are found we can make the release package
> for the release. If any critical bugs are found, we do a new RC
> every week. The reason to keep this short is that we actually
> want a release some day.
>
>
>22-03-2002 Release of PHP 4.2.0
>
> Work is done, time to release.
>
>
>Classification of bug severities
>--------------------------------
>
>Normal bugs: Well, all little icky things that are not totally ok.
>
>Severe bugs: Bugs that deal with major malfunctions in extensions
>
>Critical bugs: Bugs that deal with malfuctions in mainstream (either
> minor or major). Mainstream modules are IMO: session,
> mysql, gd, odbc, mssql, curl, domxml, imap, ldap, mcrypt,
> oci8, pcre, pdf, pgsql, standard :), xml and xslt
>
> Security related bugs in every extension
>
> Crash bugs in the mainstream extensions, or crash bugs
> that tend to happen a lot in non-mainstream extensions (ie
> if enabling an extension crashes PHP).
>
>
>Release Master: I'd like to volunteer for that
>Release Bitch: Jani, he likes bitching ;)
>Test Master: Position vacant
>
>I hope this all made some sense, we've 5 days to reach consensus on this
>:)
>
>regards,
>
>Derick Rethans
>
>---------------------------------------------------------------------
> PHP: Scripting the Web - www.php.net - derick@php.net
> SRM: Site Resource Manager - www.vl-srm.net
>---------------------------------------------------------------------
> JDI Media Solutions - www.jdimedia.nl - d.rethans@jdimedia.nl
> Boulevard Heuvelink 102 - 6828 KT Arnhem - The Netherlands
>---------------------------------------------------------------------
>
>
>
>
>
>
--