Bug #64489 [Opn->Fbk]: wrong caclulation with date_diff
Edit report at https://bugs.php.net/bug.php?id=64489&edit=1
ID: 64489
Updated by: aharvey@php.net
Reported by: phpbug at samic dot us
Summary: wrong caclulation with date_diff
-Status: Open
+Status: Feedback
Type: Bug
Package: Date/time related
Operating System: Linux Ubuntu
PHP Version: 5.4Git-2013-03-22 (snap)
Block user comment: N
Private report: N
New Comment:
Which time zone is your PHP installation using â ie what do you get if you echo
date_default_timezone_get()?
Previous Comments:
------------------------------------------------------------------------
[2013-03-22 12:00:26] phpbug at samic dot us
Description:
------------
date_diff has a problem with a specific date
it doesn't calculate days between two dates correctly
please see the example
( it seems there is a similar problems: http://www.php.net/manual/en/datetime.diff.php#101990
)
Test script:
---------------
$interval = date_diff(date_create('2000-03-21'), date_create('2013-03-21'));
echo $interval->format('%a') . "<br>\n"; // will output 4747
$interval = date_diff(date_create('2000-03-21'), date_create('2013-03-22'));
echo $interval->format('%a') . "<br>\n"; // will output 4749 ---
WRONG!
$interval = date_diff(date_create('2000-03-21'), date_create('2013-03-23'));
echo $interval->format('%a') . "<br>\n"; // will output 4749
$interval = date_diff(date_create('2000-03-21'), date_create('2013-03-24'));
echo $interval->format('%a') . "<br>\n"; // will output 4750
Expected result:
----------------
4747
4748
4749
4750
Actual result:
--------------
4747
4749
4749
4750
the second calculation is wrong
------------------------------------------------------------------------
--
Edit this bug report at https://bugs.php.net/bug.php?id=64489&edit=1
Thread (5 messages)