Req #61366 [Com]: DateInterval should support weeks and days combined

From: Date: Fri, 27 Sep 2013 17:08:52 +0000
Subject: Req #61366 [Com]: DateInterval should support weeks and days combined
References: 1  Groups: php.bugs 
Request: Send a blank email to php-bugs+get-181804@lists.php.net to get a copy of this message
Edit report at https://bugs.php.net/bug.php?id=61366&edit=1

 ID:                 61366
 Comment by:         krewecherl at gmx dot net
 Reported by:        evert at rooftopsolutions dot nl
 Summary:            DateInterval should support weeks and days combined
 Status:             Open
 Type:               Feature/Change Request
 Package:            Date/time related
 Operating System:   Any
 PHP Version:        5.3.10
 Block user comment: N
 Private report:     N

 New Comment:

It could not be a part of "days", because "days" is only available when using 
DateTime::diff().

IMHO, silently ignoring part of the input is the worst of all possible solutions. 
"P1W1D" is not a valid ISO-8601 duration, so this should throw an Exception. 
Alternatively, PHP could be extra helpful and allow mixed input like that. But 
just ignoring the weeks is definitely not good.


Previous Comments:
------------------------------------------------------------------------
[2012-03-14 10:16:25] evert at rooftopsolutions dot nl

But it appears that currently both P1W and P1D individually get parsed into the 'd'
property.

Wouldn't it make more sense to retain this behaviour when both are supplied, but just add them
up?

In a sense ->d itself is also a computed property, as this is weeks * 7 for P1W. There is no
->w property.

------------------------------------------------------------------------
[2012-03-14 10:08:52] derick@php.net

It should not be as part of "d", but rather as part of "days". I can quite
easily add this for just weeks and days, but putting months etc in the mix is not going to work. In
any case, ->days is the only computed property, the rest are as parsed.

------------------------------------------------------------------------
[2012-03-14 09:19:40] evert at rooftopsolutions dot nl

Well, I have several counter points:

1) If it's not supported, it should throw an exception. At the moment it fails silently.
2) There's no reason to support a superset of ISO 8601
3) I'm using this because I'm implementing an iCalendar parser. The DURATION property type
is based on ISO 8601:

http://tools.ietf.org/html/rfc5545#section-3.3.6

In the wild I'm finding duration values with mixed weeks and days. Now I need to pre-parse this
string, do weeks * 7, then regenerate the (almost identical) string before I can add it to the
constructor.

I feel adding support for W and D at the same time does not pose additional confusion, and is a
sensible feature.

------------------------------------------------------------------------
[2012-03-14 01:51:40] uramihsayibok at gmail dot com

ISO 8601 doesn't allow mixing weeks with anything else.

If you need both then just do the math: 7 * weeks + days

------------------------------------------------------------------------
[2012-03-12 21:53:19] evert at rooftopsolutions dot nl

Description:
------------
The DateInterval should support specifying weeks and days at the same time.

This is documented to not be supported, but this is imho silly and confusing.

Test script:
---------------
<?php

$di = new DateIterval('P1W1D');
echo $di->d;

?>

Expected result:
----------------
8

Actual result:
--------------
1


------------------------------------------------------------------------



-- 
Edit this bug report at https://bugs.php.net/bug.php?id=61366&edit=1


Thread (1 message)

  • krewecherl at gmx dot net
  • Unknown Message
    • krewecherl at gmx dot net
« previous php.bugs (#181804) next »