note 101379 added to function.date
| From: | ghotinet at osu1 dot php dot net | Date: | Mon, 13 Dec 2010 18:06:29 +0000 |
| Subject: | note 101379 added to function.date | ||
| Groups: | php.notes | ||
| Request: | Send a blank email to php-notes+get-174886@lists.php.net to get a copy of this message | ||
Most spreadsheet programs have a rather nice little built-in function called NETWORKDAYS to
calculate the number of business days (i.e. Monday-Friday, excluding holidays) between any two given
dates. I couldn't find a simple way to do that in PHP, so I threw this together. It replicates
the functionality of OpenOffice's NETWORKDAYS function - you give it a start date, an end date,
and an array of any holidays you want skipped, and it'll tell you the number of business days
(inclusive of the start and end days!) between them.
I've tested it pretty strenuously but date arithmetic is complicated and there's always
the possibility I missed something, so please feel free to check my math.
The function could certainly be made much more powerful, to allow you to set different days to be
ignored (e.g. "skip all Fridays and Saturdays but include Sundays") or to set up dates
that should always be skipped (e.g. "skip July 4th in any year, skip the first Monday in
September in any year"). But that's a project for another time.
<?php
function networkdays($s, $e, $holidays = array()) {
// If the start and end dates are given in the wrong order, flip them.
if ($s > $e)
return networkdays($e, $s, $holidays);
// Find the ISO-8601 day of the week for the two dates.
$sd = date("N", $s);
$ed = date("N", $e);
// Find the number of weeks between the dates.
$w = floor(($e - $s)/(86400*7)); # Divide the difference in the two times by seven days to get the
number of weeks.
if ($ed >= $sd) { $w--; } # If the end date falls on the same day of the week or a later day of
the week than the start date, subtract a week.
// Calculate net working days.
$nwd = max(6 - $sd, 0); # If the start day is Saturday or Sunday, add zero, otherewise add six
minus the weekday number.
$nwd += min($ed, 5); # If the end day is Saturday or Sunday, add five, otherwise add the weekday
number.
$nwd += $w * 5; # Add five days for each week in between.
// Iterate through the array of holidays. For each holiday between the start and end dates that
isn't a Saturday or a Sunday, remove one day.
foreach ($holidays as $h) {
$h = strtotime($h);
if ($h > $s && $h < $e && date("N", $h) < 6)
$nwd--;
}
return $nwd;
}
$start = strtotime("1 January 2010");
$end = strtotime("13 December 2010");
// Add as many holidays as desired.
$holidays = array();
$holidays[] = "4 July 2010"; // Falls on a Sunday; doesn't affect count
$holidays[] = "6 September 2010"; // Falls on a Monday; reduces count by one
echo networkdays($start, $end, $holidays); // Returns 246
?>
Or, if you just want to know how many work days there are in any given year, here's a quick
function for that one:
<?php
function workdaysinyear($y) {
$j1 = mktime(0,0,0,1,1,$y);
if (date("L", $j1)) {
if (date("N", $j1) == 6)
return 260;
elseif (date("N", $j1) == 5 or date("N", $j1) == 7)
return 261;
else
return 262;
}
else {
if (date("N", $j1) == 6 or date("N", $j1) == 7)
return 260;
else
return 261;
}
}
?>
----
Server IP: 64.71.164.2
Probable Submitter: 208.176.90.90
----
Manual Page -- http://www.php.net/manual/en/function.date.php
Edit -- https://master.php.net/note/edit/101379
Del: integrated -- https://master.php.net/note/delete/101379/integrated
Del: useless -- https://master.php.net/note/delete/101379/useless
Del: bad code -- https://master.php.net/note/delete/101379/bad+code
Del: spam -- https://master.php.net/note/delete/101379/spam
Del: non-english -- https://master.php.net/note/delete/101379/non-english
Del: in docs -- https://master.php.net/note/delete/101379/in+docs
Del: other reasons-- https://master.php.net/note/delete/101379
Reject -- https://master.php.net/note/reject/101379
Search -- https://master.php.net/manage/user-notes.php