Re: XML_Xpath
| From: | Greg Beaver | Date: | Fri, 30 Jan 2004 01:04:06 +0000 |
| Subject: | Re: XML_Xpath | ||
| References: | 1 2 3 | Groups: | php.pear.qa |
| Request: | Send a blank email to pear-qa+get-429@lists.php.net to get a copy of this message | ||
Lukas Smith wrote:
Well the problem is that the QA teams currently has no authority at all. Packages are the sole authority of the respective maintainer in the current regulations.Isn't this being worked on by the discussion here? I think 6 months is plenty of time to say a maintainer no longer has time to maintain a package. This should be defined as 6 months without a cvs commit or response to an open bug. In gray areas (response to a bug is "I'll do that soon" 4 months after it's opened), I'd say a year without any code commit or a new release means the maintainer is inactive no matter what. If bugs are fixed in CVS, but a release is not made, I'd say QA team should have authority to do a QA release. The time frame should not be set in stone, I think this would cause too much contention, but it should be at least a month for non-critical bugs. Obviously critical bugs should be fixed within 24-48 hours if possible for stable releases. Once 1.3 final is out, we will have channels at our disposal, and this means that QA releases can be done on a sub-channel with no adverse affect on pear upgrade-all, and this will eliminate the issue of how long to wait before doing a QA release. Greg