Re: Re: Release process
| From: | Andi Gutmans | Date: | Thu, 03 May 2001 10:25:02 +0000 |
| Subject: | Re: Re: Release process | ||
| References: | 1 | Groups: | php.dev php.qa |
| Request: | Send a blank email to php-dev+get-53568@lists.php.net to get a copy of this message | ||
At 11:16 AM 5/3/2001 +0100, Phil Driscoll wrote:
Andi wrote: That brings me to more current events. I'd like to roll an RC1 for 4.0.6 pretty soon (Saturday?). I don't want to slow things down here, and if Saturday can be achieved, all well and good, but we perhaps ought to have a strong guideline that, say, 1 weeks warning of an impending RC is given. That will give everyone time to either get their important stuff in, or argue for a delay, and there will be a lower probability of people wanting to stick stuff in other than bugfixes after RC1.I already mailed about it a few days ago. I think a lot of changes have been made since 4.0.5, especially a lot of good bug fixes, and it's a good idea to start getting 4.0.6 out of the door. 4.0.5 branched a looooooong time ago.
If we can't have a firm rule that only bug fixes go in after RC1, can we at least agree that that is the guideline in upper case bold 72 point flashing red and green text?I think that can be done :) Andi