Maintainer of Date_Calc
| From: | Erik Hjortsberg | Date: | Sat, 04 Aug 2001 15:31:37 +0000 |
| Subject: | Maintainer of Date_Calc | ||
| Groups: | php.pear.dev | ||
| Request: | Send a blank email to pear-dev+get-1294@lists.php.net to get a copy of this message | ||
Does anyone know how to contact the maintainer of Date_Calc, Monte Ohrt?
I've mailed him to no avail and I've not seen him on the list...
Anyways, does anybody know any method of converting an arbitary number of days to a correct date, such as '2001-01-40' => '2001-02-09'?
I've working on a Date-class, the problem is that I wan't to use the functions in Date_Calc as much as possible, but they contain a lot of error-checking which is unnecessary. It would be better if instead of the entity methods in Date using the static methods of Date_Calc the latter would instead use the methods of Date. The interface of Date_Calc would be exactly the same, but the speedup of Date would be significant.
/erik hjortsberg