Maintainer of Date_Calc

From: Date: Sat, 04 Aug 2001 15:31:37 +0000
Subject: Maintainer of Date_Calc
Groups: php.pear.dev 
Request: Send a blank email to pear-dev+get-1294@lists.php.net to get a copy of this message
Does anyone know how to contact the maintainer of Date_Calc, Monte Ohrt? I've mailed him to no avail and I've not seen him on the list... Anyways, does anybody know any method of converting an arbitary number of days to a correct date, such as '2001-01-40' => '2001-02-09'? I've working on a Date-class, the problem is that I wan't to use the functions in Date_Calc as much as possible, but they contain a lot of error-checking which is unnecessary. It would be better if instead of the entity methods in Date using the static methods of Date_Calc the latter would instead use the methods of Date. The interface of Date_Calc would be exactly the same, but the speedup of Date would be significant. /erik hjortsberg

« previous php.pear.dev (#1294) next »